太原电网运行方式的研究及优化

Research and Optimization of Operation Mode of Taiyuan Power Grid
下载PDF
导出
摘要 介绍了2021年第四季度清徐精细化工循环产业园区大工业用电负荷情况,分析、推算出电网发生主变“N-1”故障后,现运行方式下电网所承载的巨大风险,通过分析、测算、比较,提出了进一步优化太原电网运行方式的改进方案。 The power load of large industry in Qingxu Fine Chemical Recycling Industrial Park in the fourth quarter of 2021 is introduced,the huge risks carried by the power grid under the current operation mode after the occurrence of the main transformer"N-1"failure are analyzed and calculated.The improvement scheme to further optimize the operation mode of Taiyuan power grid is put forward based on analysis,calculation and comparison.
作者 胡兵 HU Bing(State Grid Taiyuan Power Supply Company,Taiyuan,Shanxi 030009,China)
出处 《山西电力》 2023年第2期24-27,共4页 Shanxi Electric Power
关键词 太原电网 灰色界限 灰色站址 变电灰色时段 黑色界限 黑色关联站址 变电黑色时段 Taiyuan power grid gray boundaries gray station site substation gray period black boundaries black associated station site substation black period
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部