期刊文献+

基于CGA-SM的抽水蓄能电站机电造价指标修正方法

Cost Index Correction Method for Electromechanical Equipment of Pumped Storage Power Station Based on CGA-SM
下载PDF
导出
摘要 针对现行《水电工程费用构成及概(估)算费用标准》(2013年版)中给定的抽水蓄能电站预可行性研究阶段其他机电设备费、安装费指标与概算结果偏差较大的问题,笔者结合数十个抽水蓄能电站概(估)算数据,提出基于文化遗传算法优化倒S模型(CGA-SM)的其他机电设备费、安装费估算指标的修正方法,并给出推荐的指标范围。工程比对结果表明,该估算指标修正后的计算结果与概算较为接近。这说明该指标修正方法的有效性及可行性,可为标准修编提供参考依据。 In view of the large deviation between other electromechanical equipment costs and installation cost indexs during the pre-feasibility study stage of pumped storage power stations given in the current Cost Composition and Estimate Cost Standards for Hydropower Projects 2013 Version and the actual project budget results the authors propose a correction method for other electromechanical equipment costs and installation cost estimate indexs based on cultural genetic algorithm optimized inverted S model CGA-SM combining dozens of estimated data of pumped storage power stations and provide recommended indicator ranges.The engineering comparison results show that the revised calculation results of this estimate index are relatively close to the estimated budget.This indicates the effectiveness and feasibility of the indicator correction method which can provide a reference basis for standard revision.
作者 刘春高 陈玉荣 息丽琳 马航飞 LIU Chungao;CHEN Yurong;XI Lilin;MA Hangfei(China Renewable Energy Engineering Institute,Beijing 100120 China;State Grid Xinyuan Group Co.Ltd.,Beijing 100052 China;Hebei Fengning Pumped Storage Co.Ltd.,Chengde 068350 China)
出处 《红水河》 2023年第2期23-26,53,共5页 Hongshui River
基金 国家自然科学基金重点项目(51739003) 国家重点研发计划(2018YFC0407104)。
关键词 抽水蓄能电站 其他机电设备及安装工程 造价指标 文化遗传算法 倒S模型 pumped storage power station other electromechanical equipment and installation engineering cost index cultural genetic algorithm inverted S model
  • 相关文献

参考文献5

二级参考文献51

共引文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部