摘要
结合京藏高速公路海石湾收费站连接道路,王家口互通式立交E匝道4×30m预应力混凝土连续箱梁设计过程,简要分析了曲线匝道桥梁的分析过程,给出了主要的设计计算方法。
Combined with the design process of 4×30m prestressed concrete continuous box girder for the connecting road of Haishiwan toll station of Beijing-Tibet Expressway and the 4×30m prestressed concrete continuous box girder of the interchange interchange,the analysis process of the curved ramp bridge is briefly analyzed,and the main design calculation method is given.
作者
焦亚斌
林卫建
JIAO Ya-bin;LIN Wei-jian(Lanzhou Qianyuan Traffic Planning and Design Consulting Co.LTD,Lanzhou 730030,China)
出处
《兰州石化职业技术学院学报》
2022年第4期27-29,共3页
Journal of Lanzhou Petrochemical Polytechnic
关键词
匝道桥
有限元
现浇支架施工
ramp bridge
finite element
cast-in-place support construction