摘要 在库区水流泥沙含量较高时,锦屏二级水电站需采取避沙运行方式,以降低泥沙对机组运行的不利影响。但避沙运行期间的特殊工况也将对电站的安全稳定运行提出严峻考验,故针对锦屏二级水电站的避沙运行方式进行了风险分析,最后提出的对应管控措施可有效应对电站避沙运行过程中可能产生的各种风险。 When the sediment content in the reservoir area is high,Jinping-ⅡHydropower Station needs to adopt the sediment avoidance operation mode to reduce the adverse impact of sediment on the operation of units.The special conditions during the sediment avoidance operation will also become a severe test for the safety and stability of operation,therefore,a risk analysis is carried out for the sediment avoidance operation mode of Jinping-ⅡHydropower station,and the corresponding control measures proposed at the end can effectively deal with various risks that may arise during the sediment avoidance operation.
作者 张海川 杨武 李家银 廖伟 ZHANG Haichuan;YANG Wu;LI Jiayin;LIAO Wei(Yalong River Hydropower Development Company Ltd.,Chengdu Sichuan 610051)
出处 《四川水力发电》 2023年第2期132-134,139,共4页 Sichuan Hydropower
关键词 锦屏二级水电站 避沙运行 风险分析 管控措施 Jinping-ⅡHydropower Station sediment avoidance operation risk analysis control measures
  • 相关文献

参考文献4

二级参考文献26

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部