摘要
某大桥为高低塔双索面混凝土斜拉桥,主桥横跨嘉陵江,塔柱分别高201 m和154 m,高度较高。以该大桥为背景,简要介绍高低塔双索面混凝土斜拉桥塔柱施工技术要点。
A large bridge is a concrete cable-stayed bridge with high and low towers and double cable planes.The main bridge spans the Jialing River,and the tower columns are 201 m and 154 m high respectively.Taking the bridge as the background,briefly introduces the key points of tower construction technology of high and low tower concrete cable-stayed bridge with double cable planes.
作者
谭行鹏
Tan Xingpeng(Gansu Traffic Engineering Construction Supervision Co.,Ltd.,Lanzhou,China)
出处
《科学技术创新》
2023年第10期134-137,共4页
Scientific and Technological Innovation
关键词
斜拉桥
塔柱
监控量测
爬模
cable-stayed bridge
tower column
monitoring measurement
climbing formwork