摘要 介绍了三端直流一送二方式下三站解锁和第三站投入功能,并以±500 kV禄高肇直流在进行极2金属回线解锁闭锁性能试验(一送二)时,三站解锁过程中高坡站ESOF为实例,分析了高坡站闭锁的原因,阐明了三端直流在一送二方式下三站解锁和第三站投入功能设计上存在的缺陷,进而提出了改进措施,为直流输电工程的设计和运行提供借鉴。 The three-station unlocking and third-station operation functions under the three-terminal DC one-to-two mode are introduced.Taking the ESOF of Gaopo station during the unlocking process of the three-station using the±500 kV Lu Gaozhao DC in the extreme 2 metal loop unlocking performance test(one-to-two)as an example,the reasons for the Gaopo station latching are analyzed.The defects in the design of three-terminal DC unlocking and third station operation function under the one-to-two mode are clarified,and then improvement measures are proposed to provide reference for the design and operation of HVDC transmission projects.
作者 李莉 唐颖章 LI Li;TANG Yingzhang(GZ Bureau of CSG EHV Power Transmission Company,Guangzhou 510700,China)
出处 《电工技术》 2023年第6期118-120,共3页 Electric Engineering
关键词 三端直流 三站解锁 第三站投入 three stations DC transmission system three stations deblock operate of the third station
  • 相关文献

参考文献1

二级参考文献11

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部