摘要
以某变电站为例,对绿色电网项目一体化雨污处理施工技术进行研究,综述了使用一体化污水处理设备,配置洗车槽和冲厕废水循环系统,配置污水统一收集系统,配置绿化、扬尘、场地冲洗和混凝土养护废水使用系统,解决了工程施工过程中雨污循环使用问题,不仅节约了水资源,降低了成本,绿色节能环保,而且提升了3C绿色电网建设。
Taking a substation as an example,the construction technology of integrated rain and sewage treatment for a green power grid project was studied.The use of integrated sewage treatment equipment,the deployment of car wash tanks and toilet flushing waste water cycle,the problems of rainwater and sewage recycling in the construction process of the project are solved,and the water resources are not only saved,but also the water resources are saved,cost reduction,green energy conservation and environmental protection,and enhance the3C green grid construction.
作者
黄浪平
HUANG Langping(Guangdong Construction Machinery Factory Co.,Ltd.Guangzhou 510500,China)
出处
《广东土木与建筑》
2023年第4期94-95,98,共3页
Guangdong Architecture Civil Engineering
关键词
绿色电网
一体化
雨污处理
雨污循环
自动控制
调试药剂
并联设置
离心泵
自吸泵
玻璃钢化粪池
green power grid
integration
rain and sewage treatment
rain and sewage cycle
automatic control
debugging reagents
parallel setting
centrifugal pump
self-priming pump,glass fiber reinforced septic tank