摘要
为了实现高速铁路工程建设环境保护与水土保持全过程技术管理,通过建设项目环境保护与水土保持目标和工作重点的全面阐释,重点说明高速铁路建设项目方案研究阶段、预可行性研究阶段、可行性研究阶段、初步设计阶段、施工图设计阶段、招投标阶段、施工期准备阶段、施工阶段、验收管理及变更管理时期各参建单位的重点工作,以期实现对高速铁路项目工程建设环境保护与水土保持全过程规范化管理。
In order to realize the technical management of the whole process of environmental protection and water and soil conservation in high-speed railway project construction,through the comprehensive explanation of the objectives and work emphases of environmental protection and soil and water conservation in construction projects,the key work of each participating unit in high-speed railway project construction project scheme research,pre-feasibility study stage,feasibility study stage,preliminary design stage,construction drawing design stage,bidding stage,construction period preparation stage,construction stage,acceptance management and change management stage are emphatically explained,so as to realize the standardized management of the whole process of environmental protection and water and soil conservation in highspeed railway project construction.
作者
王志科
李廷山
唐渭
周小永
袁鹏洲
余文斐
WANG Zhike;LI Tingshan;TANG Wei;ZHOU Xiaoyong;YUAN Pengzhou;YU Wenfei(Chengdu Branch,China Railway Academy Co.,Ltd.,Chengdu Sichuan 610000,China)
出处
《铁路节能环保与安全卫生》
2023年第2期16-21,共6页
Railway Energy Saving & Environmental Protection & Occupational Safety and Health
关键词
高速铁路
工程建设
环境保护
水土保持
管理措施
High-speed railway
Engineering construction
Environmental protection
Water and soil conservation
Management measure