摘要 以某小直径超长距离盾构隧道内现浇混凝土平台施工为例,从运输轨道、隧道内混凝土搅拌运输车、施工段划分、混凝土垂直运输、混凝土供应等方面开展深入研究和探索,提出了切实可行的小直径超长距离隧道内现浇混凝土平台高效施工技术。工程实例表明,该施工技术合理可行,操作性强,比原计划工期提前完成了现浇混凝土平台施工作业,可为今后类似工程提供指导和借鉴。 Taking the construction of cast-in-place concrete platform in a small diameter and ultra-long distance shield tunnel as an example,it is researched and explored deeply from the aspects of transportation track,concrete mixer truck in the tunnel,construction section division,concrete vertical transportation,concrete supply,etc.,and the practical and effective construction technology of cast-in-place concrete platform in a small diameter and ultra-long distance tunnel is proposed.The project example shows that the construction technology is reasonable and feasible,and the operability is strong.The cast-in-place concrete platform construction is completed ahead of the original schedule,which can provide guidance and reference for similar projects in the future.
作者 马霞军 MA Xiajun(Shanghai Mechanized Construction Group Co.,Ltd.,Shanghai 200072,China)
出处 《建筑施工》 2023年第4期719-722,共4页 Building Construction
基金 上海建工集团重点科研课题(18JCSF-42)。
关键词 小直径盾构隧道 超长距离 隧道内混凝土浇筑 高效施工 small diameter shield tunnel ultra-long distance concrete pouring in tunnel efficient construction
  • 相关文献

参考文献3

二级参考文献25

  • 1何涛,陈文祥.铝模早拆体系下的楼板裂缝控制有限元建模与分析[J].建筑结构,2021,51(S01):1361-1367. 被引量:1
  • 2宋克志,王梦恕.ECL技术在我国应用的可行性研究[J].建井技术,2004,25(5):31-35. 被引量:5
  • 3顾国明,陆运.隧道施工中的挤压混凝土衬砌法[J].铁道建筑技术,2005(5):28-32. 被引量:3
  • 4陈馈,康宝生.国内外盾构法隧道施工实例[M].洛阳:中铁隧道集团有限公司,2006.
  • 5朱敏,牟瀚林.挤压混凝土衬砌综述[J].隧道建设,2007,27(4):30-32. 被引量:4
  • 6長崎光男,友回孝·EeLとカフ.セル搬送で長大トンネルの高速施工に挑む[J].トンネルと地下, 1991, 22 (10): 15-23.
  • 7王强华,楼如岳.超大型矩形盾构ECL工法钢模板支撑系统[J].现代隧道技术,2006,(S):428-431.
  • 8Hiroomi IIDA, Tomomi IURA, Shinji KONISHI, et al. Application of "Casting Support Tunneling System Using TBM" to Uncon- solidated Soil with High Groundwater Level[A]. Proceedings of the International World Tunnel Congress and the 31st ITA General Assembly [C]. Istanbul, Turkey: 2005, 765-771.
  • 9Hiroomi IIDA, Takashi KITAGAWA, Keizo CHISHIRO, et al. Internal Strain Measurement Method of the Extruded Concrete Lin- ing[A]. Proceedings of the World Tunnel Congress and 32nd ITA Assembly [C]. Seoul, Korea: 2006, 1-6.
  • 10吴林.盾构隧道双层衬砌计算模型与力学特性研究[D].成都:西南交通大学,硕士论文,2008.

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部