期刊文献+

油田注水开发后期提升采油率的技术措施研究 被引量:2

Study on the technical measures to improve oil recovery in the late stage of oilfield water injection development
下载PDF
导出
摘要 为了达到油田注水开发后期提升采油率的目标,本次研究主要是对影响采油率的因素进行分析,提出油田注水开发后期提升采油率的技术措施,为推动我国油田产业的进一步发展奠定基础。研究表明:在油田注水开发后期阶段,地层中的原油储量不断降低,地质因素以及技术因素会对采油率产生重要影响,因此,需要采取改良技术支持、强化环境分析、调整注采规模、优化注采方案以及注重效果评价等多种措施,使采油率可以得到一定的提升。 In order to achieve the goal of increasing the oil recovery rate in the later stage of oilfield water injection development,this study mainly analyzes the factors that affect the oil recovery rate,puts forward technical measures to improve the oil recovery rate in the later stage of oilfield water injection development,and lays a foundation for promoting the further development of China’s oilfield industry.The research shows that in the later stage of oilfield water injection development,the crude oil reserves in the formation are continuously decreasing,and geological and technical factors will have an important impact on the oil recovery rate.Therefore,it is necessary to take various types of measures,such as improving technical support,strengthening environmental analysis,adjusting the injection production scale,optimizing the injection production plan,and paying attention to the effect evaluation,to improve the oil recovery rate to a certain extent.
作者 张海燕 Zhang Haiyan(Wuqi Oil Production Plant of Yanchang Oilfield Co.,Ltd,Yan'an Shaanxi 717600)
出处 《石化技术》 CAS 2023年第4期71-73,共3页 Petrochemical Industry Technology
关键词 注水开发 采油率 技术要求 影响因素 技术措施 Water injection development Oil recovery rate Technical requirements Influencing factors Technical measures
  • 相关文献

参考文献5

二级参考文献13

共引文献24

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部