山岭重丘区不良地质隧道施工技术难点分析 被引量:1

ANALYSIS OF DIFFICULTIES IN CONSTRUCTION TECHNOLOGY OF TUNNELS WITH UNFAVORABLE GEOLOGICAL CONDITIONS IN MOUNTAINOUS AREAS
下载PDF
导出
摘要 针对山岭重丘区不良地质隧道施工问题,以新圆梁山隧道2号高压富水溶洞段隧道为工程背景,研究在岩溶地段发育有高压富水充填溶洞等地质条件下,溶洞段隧道超前预支护以及隧道扩挖施工方法的比选,通过对现场监控量测数据对比分析验证了施工方法的可行性。 In view of the construction problems of tunnels with unfavorable geological conditions in mountainous and hilly areas,taking xinyuanliangshan tunnel high pressure water rich karst cave section tunnel as the engineering background,this paper studies the comparison and selection of advance pre support and tunnel expansion construction methods in karst section under the geological conditions of high pressure and rich water filling karst cave in karst area,and verifies the construction method by comparing and analyzing the field monitoring data.
作者 胡刚 HU Gang(The Third Engineering Co.,Ltd.,of China Railway 19th Bureau Group,110136,Shenyang,China)
出处 《建筑技术》 2023年第8期919-921,共3页 Architecture Technology
关键词 不良地质 溶洞 隧道施工 unfavorable geology karst cave tunnel construction
  • 相关文献

参考文献3

二级参考文献3

共引文献4

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部