随着火力发电机组越来越多地参与到电网深度调峰运行,造成原本并不适合负荷大幅度频繁变化运行的发电机短路故障频发。通过对某电厂330 MW发电机转子包间、匝间短路故障进行分析判断,指出深度调峰运行对于发电机转子的影响。对发电机转子不同结构进行剖析,结合实际提出转子短期修理和长期升级改造方案,确保机组稳定运行。
As thermal power generator units are increasingly involved in deep peaking operation on the grid,this results in the frequent occurrence of short-circuit faults in the generators that are not originally suitable for operation with large and frequent load changes.Through the analysis and judgment on the short-circuit faults occurred in the 330 MW generator rotor inter-package and inter-turn in the certain power plant,the impact on generator rotors coming from the deep peaking operation is pointed out.The different structures of the generator rotor are analyzed,a program for short-term repair and long-term upgrading of the rotor is put forward combined with the practice,to ensure stable operation of the unit.
作者
王书平
WANG Shuping(State Power Investment Group Henan Electric Power Co.,Ltd.Technical Information Center,450000)
出处
《电机技术》
2023年第2期19-22,26,共5页
Electrical Machinery Technology
关键词
发电机转子
匝间短路
端部结构
升级改造
generator rotor
inter-turn short-circuit end structure