4DANDY G C, ENGELHARDT M. Optimal scheduling of water pipe replacement using genetic algorithms [J].Journal of Water Resources Planning and Management,ASCE, 2001, 127(4): 214- 223.
5YU Ting-chao, ZHANG Tu-qiao, LI Xun. Optimal operation of water supply systems with tanks based on genetic algorithm [J]. Journal of Zhejiang University: Science, 2005, 6A(8) : 886 - 893.