EPC模式下铁路项目的四电工程设计管理 被引量:1

Design Management of Communication,Signaling,Power Supply and Electrification Works of Railway Projects in EPC Mode
下载PDF
导出
摘要 随着更多铁路项目以工程总承包(EPC)模式开展建设,传统的建设规范、建设标准及建设流程必须根据EPC模式进行补充和修订。结合中国铁路设计集团有限公司铁路EPC项目建设的实践经验,重点围绕设计管理组织机构职责、中标前设计管理、施工图设计管理(含设计优化)、配合施工设计管理(含设计变更)、设计风险管理等5个方面,对四电工程的设计管理模式进行归纳总结,为进一步建立健全铁路EPC项目四电工程设计管理体系打下基础。 As more railway projects are built in Engineering-Procurement-Construction(EPC)mode,traditional construction specifications,standards and processes must be supplemented and revised accordingly.In combination with the practical experience of China Railway Design Corporation in railway EPC project construction,this paper summarizes the design management mode of communication,signaling,power supply and electrification works,with focus on five aspects:design management organization responsibilities,design management before bid winning,construction detail design management(including design optimization),cooperative construction design management(including design change),and design risk management,which lays a foundation for further establishing and improving the design management system of communication,signaling,power supply and electrification works of railway EPC projects.
作者 任睿 边少勇 REN Rui;BIAN Shaoyong(Electrification&Telegraphy Engineering Design Research Department,China Railway Design Corporation,Tianjin 300308,China;Development Planning Department,China Railway Liuyuan Group Co.,Ltd.,Tianjin 300308,China)
出处 《铁路技术创新》 2023年第2期22-29,共8页 Railway Technical Innovation
关键词 铁路项目 EPC 四电工程 设计管理 railway project EPC communication,signaling,power supply and electrification works design management
  • 相关文献

参考文献4

二级参考文献13

共引文献34

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部