防城港调车场新增股道信号工程施工技术研究

Study on Construction Technology of New Track Reconstruction Project of the Second Shunting Yardof Fangchenggang
下载PDF
导出
摘要 信联闭停用前通过对信号设备的单项试验与信号子系统调试,科学严谨的施工安排,掌握信号联锁、CTC/TDCS、信号集中监测、STP软件系统,缺口监测设备、计轴设备软件等新旧设备更新替换的节奏,为信号系统的安全有序开通提供重要保证。这种施工技术研究对类似信号改造工程有一定的参考和指导意义。 Before the signal interlocking system is shut down,through the single test of the signal equipment and the commissioning of the signal subsystem,scientific and rigorous construction arrangement,master the section of updating and replacing the old and new equipment such as signal interlocking,ctc/tdcs,centralized signal monitoring,STP software system,gap monitoring equipment,axle counter equipment software,etc.,so as to provide an important guarantee for the safe and orderly opening of the signal system.This construction technology research has certain reference and guiding significance for similar signal reconstruction projects.
作者 罗荣德 LUO Rong-de(China Railway 25th Bureau Group Electrical Engineering Co.,Ltd.,Guangzhou 510600,China)
出处 《价值工程》 2023年第14期66-68,共3页 Value Engineering
关键词 信联闭停用 软件倒替 试验 测试 调试 signal linkage shutdown software replacement test test debugging
  • 相关文献

参考文献3

二级参考文献5

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部