摘要 随着我国交通建设发展,新建公(道)路与既有铁路交叉不可避免,在不中断铁路运营的情况下,优先选择公(道)路下穿铁路,其框架采用顶进法施工。采用顶进法施工方案时,除新建结构满足自身强度及稳定性外,还需采取适当的措施加固、防护铁路,常用的加固方案为架设D型施工便梁。通过理论分析,研究了便梁支墩在设计与施工中的一些要点,为此类桥涵的设计、施工等提供参考建议。 With the development of traffic construction in China,it is inevitable that the new road crosses the existing railway.The road cross the railway without interrupting the railway operation,and the frame is constructed by jacking method.In addition to the new structure meeting its own strength and stability,appropriate measures need to be taken to reinforce the railway.The common strengthening way is using the D-type construction temporary beam.Through theoretical analysis,some control factors in design and construction of temporary beam buttress are studied to provide reference for designing and constructing such bridges and culverts.
作者 吴天群 WU Tian-qun(China Railway Shanghai Design Institute Co.,Ltd.,Nanchang 330000,China)
出处 《价值工程》 2023年第14期88-90,共3页 Value Engineering
关键词 顶进下穿铁路 加固铁路 便梁支墩 jacking under existing railways reinforce the railway temporary beam buttress
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部