期刊文献+

基于役龄回退模型的露天矿卡车周期预防性维护策略 被引量:1

Periodic preventive maintenance strategy of open-pit mine truck based on age-reduction model
下载PDF
导出
摘要 针对露天矿生产运输中卡车维护成本较高的问题,对卡车采用周期预防性维护和小修相结合的维护方式,考虑露天矿卡车周期预防维护后故障率的变化规律,基于役龄回退模型研究了露天矿卡车周期预防维护策略。针对露天矿卡车故障率函数服从威布尔分布特点,引入役龄回退因子反应露天矿卡车在每次周期预防维护后的故障率变化,建立露天矿卡车每次周期预防维护后的故障率函数。基于露天矿卡车的故障率函数,建立包括露天矿卡车周期预防维护成本和小修成本的预防维护总成本模型,为求取露天矿卡车最优的周期预防维护策略设计了求解算法。研究结果表明:当露天矿卡车运行时间确定时,预防维护成本随着预防维护次数增加先减小后增大,随着预防维护周期变长先变小再变大;随着露天矿卡车运行时间的变长,最优预防维护次数呈增长趋势;露天矿卡车采用最优的周期预防维护策略比常用的维修策略的所需成本更小且随着露天矿卡车运行时间的变长差值变大。基于役龄回退模型构建露天矿卡车每次周期预防维护后的故障率函数,研究卡车在不同运行时间的最优周期预防维护策略,可为矿山设备预防维护管理提供有效的解决方案。 In view of high maintenance cost of trucks in the production and transportation of open-pit mine,a combination of periodic preventive maintenance and minor repairs was adopted for truck.Considering the change rule of failure rate after periodic preventive maintenance of open-pit mine truck,based on age-reduction model,periodical preventive maintenance strategy of open-pit mine truck was studied.According to the characteristics of the weibull distribution of open-pit mine truck failure rate function,introducing age-reduction factor to reflect change in the failure rate of open-pit mine truck after each cycle of periodic preventive maintenance,established the failure rate function of open-pit mine truck after each cycle of periodic preventive maintenance.Based on the failure rate function of open-pit mine truck,total preventive maintenance cost model including periodic preventive maintenance costs and minor repair costs of open-pit mine truck was established,and solution algorithm was designed to obtain optimal periodic preventive maintenance strategy for open-pit mine truck.The results show that:when operating time of open-pit mine truck was determined,preventive maintenance cost first decreases and then increases with the increase in the number of preventive maintenance,and first becomes smaller and then larger as the preventive maintenance cycle becomes longer;As the operating time increases,the number of optimal preventive maintenance increase slower;The optimized periodic preventive maintenance strategy for open-pit trucks requires less cost than the common maintenance strategy,and the difference becomes larger as the operating time becomes longer.Constructing failure rate function of open-pit mine truck based on the agereduction model,and to study the periodic preventive maintenance strategies of trucks with different operating hours,which can provide effective solutions for preventive maintenance and management of mining equipment.
作者 李雯静 邱莉 林志勇 姚囝 谢展扬 LI Wenjing;QIU Li;LIN Zhiyong;YAO Nan;XIE Zhanyang(School of Resource and Environmental Engineering,Wuhan University of Science and Technology,Wuhan 430081,China;School of Remote Sening and Information Engineering,Wuhan University,Wuhan 430079,China)
出处 《煤炭科学技术》 CAS CSCD 北大核心 2023年第4期209-214,共6页 Coal Science and Technology
基金 国家自然科学基金资助项目(51804224)。
关键词 露天矿卡车 周期预防维护 役龄回退因子 卡车维护 open-pit mine truck periodic preventive maintenance age-reduction factor truck maintenance
  • 相关文献

参考文献11

二级参考文献112

  • 1郭年琴,梁玉.电铲维修成本的数学模型[J].煤炭学报,2007,32(3):321-326. 被引量:4
  • 2焦洋,孙家兰,温慧明.煤矿设备管理系统设计[J].煤炭科学技术,2013,41(S2):323-324. 被引量:2
  • 3骆中洲,王连印.露天矿汽车运输的故障与维修[J].有色金属(矿山部分),1989,41(5):1-6. 被引量:2
  • 4舒启林,王成恩.产品全生命周期信息模型研究[J].计算机集成制造系统,2005,11(8):1051-1056. 被引量:19
  • 5徐得潜,章征宝.设备大修理经济性分析方法探讨[J].合肥工业大学学报(自然科学版),2006,29(12):1496-1498. 被引量:4
  • 6Sothard Tom. Economic impact of equipment downtime [J]. AFE Facilities Engineering Journal, 1996, 23 (6) : 19.
  • 7Goldberg Bernard. Provably optimal economic decision-making [ A]. ASEE Annual Conference Proceedings [ C ]. 2000: 4 879 -4 888.
  • 8Frangopol Dan M, Liu Min. Maintenance and management of civil infrastructure based on condition, safety, optimization, and life-cycle cost [ J ]. Structure and Infrastructure Engineering, 2007, 3 (1) : 29 -41.
  • 9Alarie S, Gamache M, 2002. Overview of solution strategies used in truck dispatching systems for open pit mines. In- ternational Journal of Mining, Reclamation and Envi- ronment, 16(1): 59- 76.
  • 10Alford C, 1995. Optimisation in underground mine design. //Proc. of XXV APCOM Symp (McKee Ded.). Mel- bourne: Inst. of Mining and Metallurgy. 213 -218.

共引文献68

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部