期刊文献+

BIM技术协同集成项目交付的水利工程项目建设研究 被引量:1

Research on Water Conservancy Project Construction Delivered by BIM Technology Collaborative Integration Project
下载PDF
导出
摘要 为了实现对水利工程项目的协同集成管理,提出BIM技术协同集成项目交付的水利工程项目建设模型,采用BIM技术实现对项目建设的可度量性和渐变性的特征数据检测,获得水利工程项目管理的量化参数模糊集,通过不确定信息分类方法建立BIM技术协同集成项目交付的层次结构模型,实现对水利工程项目建设的风险检验和量化评估。结果表明,该模型能有效实现对水利工程项目建设的综合评价和决策,提高对工程项目交付的量化评价能力。 In order to realize the collaborative integrated management of water conservancy projects,this paper puts forward a model of water conservancy project delivery based on BIM technology,uses BIM technology to detect the measurable and gradual characteristic data of project construction,obtains the fuzzy set of quantitative parameters of water conservancy project management,establishes the hierarchical structure model of BIM technology collaborative integrated project delivery through uncertain information classification method,and realizes the risk inspection and quantitative evaluation of water conservancy project construction.The results show that the model can effectively realize the comprehensive evaluation and decision-making of water conservancy project construction and improve the quantitative evaluation ability of project delivery.
作者 廖志国 LIAO Zhi-guo(Wan’an County Water Conservancy and Hydropower Development Service Center,Wan’an 343800,Jiangxi,China)
出处 《水利科技与经济》 2023年第5期97-101,共5页 Water Conservancy Science and Technology and Economy
关键词 BIM技术 协同集成 项目交付 水利工程 项目建设 综合评价决策 BIM technology collaborative integration project delivery water conservancy project project construction comprehensive evaluation decision
  • 相关文献

参考文献11

二级参考文献73

共引文献47

同被引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部