期刊文献+

高大模板施工技术和管理控制措施

Control Measures for Construction Technology and Management of Tall Formwork
下载PDF
导出
摘要 高大模板在施工过程中有特殊要求,需提前编制专项施工方案,并经过专家论证合格后方可实施。论文简述了高大模板的概念,并结合实际案例,从材料选择、支撑设置、模板安装、钢筋混凝土浇筑、支撑拆除和施工安全的角度总结高大模板支撑体系施工中遇到的重难点。 The tall formwork has special requirements in the construction process, so a special construction plan needs to be prepared in advance, and it can be implemented only after being proved qualified by experts. This paper describes the concept of tall formwork, and combined with the actual cases, from the material selection, support setting, formwork installation, reinforced concrete placement, support removal and construction safety point of view to summarize the heavy difficulties encountered in the construction of tall formwork support system.
作者 刘应蛟 LIU Ying-jiao(China Railway 22nd Bureau Group Rail Engineering Co.Ltd.,Beijing 100040,China)
出处 《工程建设与设计》 2023年第8期107-109,共3页 Construction & Design for Engineering
关键词 高大模板 施工技术 管理 控制措施 tallformwork construction technology management control measure
  • 相关文献

参考文献1

二级参考文献4

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部