摘要
阐述了新疆某项目部高海拔高寒地区多年冻土路基的施工技术措施,特别是对冻土路基处理的工序流程,填石路基、碎石垫层、防水土工膜、土工格栅、路床施工等施工工艺及注意事项做出详细的介绍,并针对高海拔高寒地区多年冻土路基的处置方法等进行详细的分析。
This paper describes the construction technical measures of permafrost subgrade in high altitude and cold region of a project department in Xinjiang, especially the processing process of permafrost subgrade, stone filling subgrade, gravel cushion, waterproof geomemics, geogrides, roadbed construction and other construction technology and matters for attention are introduced in detail. The disposal methods of permafrost subgrade in high altitude and cold region are analyzed in detail.