摘要
以绵阳科技城集中发展区核心区综合管廊及市政道路建设工程(PPP)项目为例,简要介绍了工程项目概况,针对其中现浇地下综合管廊防水施工部分展开详细探讨,结合实际施工技术措施以及相应要点内容,明确了现浇地下综合管廊防水施工技术质量控制要点,并提出了相应的质量管理措施。
Taking the integrated pipe corridor and municipal road construction(PPP) project in the core area of Mianyang Science and Technology City as an example, this paper briefly introduces the general situation of the project, discusses in detail the waterproofing construction part of the integrated pipe corridor under the pouring land, and defines the key points of technical quality control of the waterproofing construction technology of the integrated pipe corridor under the pouring land combined with the actual construction technical measures and the corresponding key points, and puts forward the corresponding quality control measures.
作者
刘银艳
张卫兵
李彦滨
刘海涛
张云辉
LIU Yin-yan;ZHANG Wei-bing;LI Yan-bin;LIU Hai-tao;ZHANG Yun-hui(China Construction Technology Group Co.Ltd.Sichuan Branch,Mianyang 621000,China;Construction Second Engineering Bureau investment branch,Beijing 100161,China;Construction Second Engineering Bureau Investment Branch,Mianyang 621000,China)
出处
《工程建设与设计》
2023年第8期223-225,共3页
Construction & Design for Engineering
关键词
现浇
地下综合管廊
防水施工
质量管理
cast-in-situ underground comprehensive pipe gallery
waterproof construction
quality management