期刊文献+

兴隆水利枢纽上下游河道下切侵蚀研究 被引量:1

Research on Downstream River Erosion of Xinglong Water Control Project
下载PDF
导出
摘要 兴隆水利枢纽建成后,受到河道下切侵蚀影响严重。河道下切侵蚀使河床高程降低,同大流量下水位降低,下游河床遭受冲刷,枯水期加剧干旱。通过对汉江皇庄-仙桃河段水文数据和兴隆水利枢纽上下游河道断面测量数据进行数值分析,了解河流下切侵蚀状况,并对其形成原因和发展趋势进行研究,计算出近年来河道下切侵蚀深度,并对下切趋势进行分析研判。 After the completion of the Xinglong Water Conservancy Project,it has been severely affected by the erosion caused by the river channel.The erosion caused by river cutting reduces the elevation of the riverbed,lowers the water level under the same large flow rate,and causes erosion of the downstream riverbed,exacerbating drought during the dry season.This article conducts numerical analysis on the hydrological data of the Huangzhuang Xiantao section of the Han River and the measurement data of the upstream and downstream river sections of the Xinglong Water Conservancy Hub,reflecting the erosion status of the river’s downward cutting,and studying its formation reasons and development trends.The depth of downward cutting erosion in the river in recent years is calculated,and the downward cutting trend is analyzed and judged.
作者 江盛威 吴铮 袁泽雄 石纯杰 JIANG Shengwei;WU Zheng;YUAN Zexiong;SHI Chunjie(Hubei Province Hanjiang Xinglong Water Conservancy Hub Management Bureau,Qianjiang,Hubei 433100)
出处 《现代工程科技》 2023年第1期30-33,共4页 Modern Engineering Technology
关键词 汉江 河道 深泓 下切 Han River river course thalweg undercut
  • 相关文献

参考文献5

二级参考文献15

共引文献28

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部