运营工作前置在轨道交通类投建营一体化PPP项目中的作用探析

Discussion on the Role of Pre-Operational Work in the Integrated PPP Project of Rail Transit Investment,Construction and Operation
下载PDF
导出
摘要 以南美地区某轨道交通投建营一体化PPP项目为例,说明运营工作前置的必要性。以实现项目“融资关闭”为目标,介绍运营在合同架构设计、运维成本优化以及防范KPI指标考核方面所做的工作,列举运营前置在该类项目中所遇的问题并提出解决建议。 Taking one ofthe PPP railway projects executing in Latin America as an example,showing the necessity of starting the O&M work at the very beginning stage of the project.To achieve"Financial Closed",introducing the work that accomplished by the O&M team in contract structuredesign,O&Mcostoptimization andprecaution of KPIdeduction,listingthe problem met in theprojectand pointing out solution advises.
作者 许麾 XU Hui(China Civil Engineering Group Co.Ltd.,Beijing 100038,China)
出处 《工程建设与设计》 2023年第9期244-246,共3页 Construction & Design for Engineering
关键词 投建营一体化 PPP 融资 有轨电车 运营 integration ofinvestment,construction and operation PPP financing tram operation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部