期刊文献+

机场跑道运行配置研究综述 被引量:1

A Review of Airport Runway Configuration Research
下载PDF
导出
摘要 机场跑道运行配置受到跑道系统布局、天气、交通需求等多因素耦合影响,使其具有高复杂度,而当前依赖管制员主观经验的跑道配置决策难以释放当前跑道系统可用时空资源的服务潜能。在此背景下,开展跑道运行配置决策技术研究能够为机场跑道动态运营和跑道时空资源分配等提供参考。梳理了机场跑道配置决策的一般流程,重点阐述了跑道配置决策的各类影响因素作用机制以及前人对其的研究情况。同时将现有研究方法划分为基于运行规则的方法和数据描述性方法,并介绍了每种方法的优缺点,最终对机场跑道配置决策未来需要重点研究的方向做出了展望。 The runway configuration of airport is affected by the coupling of multiple factors such as runway system layout,weather,and traffic demand,which makes this problem highly complex.The current runway configuration decision which rely on the subjective experience of controllers is difficult to release the service potential of the available spatiotemporal resources of the runway system.In this context,the research on runway configuration selecting technology can provide reference for the dynamic operation and spatial-temporal resource allocation of airport runway.This paper summarizes the general process of airport runway configuration decision-making,focuses on the mechanism of various influencing factors and the research situation of predecessors.At the same time,the existing research methods are divided into prescriptive models and data descriptive models,and the advantages and disadvantages of each method are introduced.Finally,the direction of key research needs to be studied in the future of airport runway configuration decision-making is prospected.
作者 王莎莎 江灏 朱聃 曾维理 WANG Sha-sha;JIANG Hao;ZHU Dan;ZENG Wei-li(Nanjing University of Aeronautics and Astronautics,Nanjing 211000,China)
出处 《航空计算技术》 2023年第3期126-129,134,共5页 Aeronautical Computing Technique
基金 国家自然科学基金项目资助(71971112) 南京航空航天大学研究生创新基地(实验室)开放基金项目资助(xcxjh20220723)。
关键词 机场跑道配置 多跑道 机场容流均衡 机场进离港容量 airport runway configuration multi-runway airport capacity balance airport arrival/departure capacity
  • 相关文献

参考文献3

二级参考文献38

  • 1Beasley J E, Krishnamoorthy M, Sharaiha Y M, et al. Scheduling aircaft landings-the static case[J]. Transporta- tion Science, 2000, 34(2): 180-197.
  • 2Romano E, Santillo L C, Zoppoli P. A static algorithm to solve the air traffic sequencing problem [J]. WSEAS Transactions on Systems, 2008, 7(6) : 682- 695.
  • 3Bojanowski L, Harikiopoulo D, Neogi N. Multi runway aircraft sequencing at congested airports[C]//Proceedings of American Control Conference, 2011 : 2759-2758.
  • 4Brinton C, Provan C, Lent S, et al. Collaborative depar ture queue management[C]//Proceedings of 9th USA/Eu- rope Air Traffic Management Research and Development Seminar, 2011.
  • 5Czerny A I. Airport congestion management under uncer tainty[J]. Transportation Research Part B: Methodologi cal, 2010, 44 (3): 371-380.
  • 6Schank J L. Solving airside airport congestion: why peak runway pricing is not working [J]. Journal of Air Trans- port Management, 2005, 11 (6): 417-425.
  • 7Australian Government. Runway allocator: interactive runway use analysis tool[R]. Canberra: Department ot" Transport and Regional Services, 2006.
  • 8Gluchshenko O, Dynamic usage of capacity for arrivals and departures in queue minimization[C]//Proceedings of IEEE International Conference on Control Applications, 2011: 139-146.
  • 9Solak S, Clarke J P B, Johnson E L. Airport terminal ca pacity planning [J]. Transportation Research Part B: Methodological, 2009, 43 (6): 659-676.
  • 10Bertsimas D, Frankovieb M, Odoni A. Optimal selection of airport runway configurations [J]. Operations Re- search, 2011, 59 (6): 1407- 1419.

共引文献24

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部