3NASA Glenn Research Center. HPT clearance control [R]. NASA-CR-2005-213970.
4Lattime S, Steinetz B. Turbine engine clearance control systems: current practices and future directions [R]. AIAA -2002-3790.
5Lu Q, Low B K. Probabilistic analysis of underground rock excavations using response surface method and SORM [J]. Computers and Geotechnics, 2011, 38( 8 ) : 1008-1021.
6Mollon G, Dias D, Soubra A H. Probabilistic analysis of pressurized tunnels against face stability using collocation based stochastic response surface method [J]. Journal of Geotechnical & Geoenvironmental Engineering, 2011, 137 (4): 385-397.