摘要
EPC总承包模式下如何做好项目总体计划控制至关重要,专项计划作为LNG接收站项目总体计划体系的补充,有利于保证总体计划顺利实施。LNG接收站工程中,针对技术复杂、工期长、影响总体关键里程碑点完成的重要单体建筑,编制专项计划可以有效识别工期风险、把握管控重点、明确完成节点,从而达到工期可控的目的。文章结合漳州LNG项目总变电所建设过程,介绍了专项计划制定的意义和编制方法。
Under EPC general contracting mode,how to control the overall project plan is very important.As a supplement to the overall plan system of LNG terminal project,the special plan schedule is conducive to ensure the smooth implementation of the overall plan.In the LNG terminal project,for the important single buildings with complex technology,long construction period and affecting the completion of overall key milestones,the preparation of special plan schedule can effectively identify the risks of the construction period,grasp the key points of management and control,and def ine the completion nodes,so as to achieve the goal of controllable construction period.Combined with the construction process of the substation of Zhangzhou LNG project,this paper introduces the signif icance and preparation method of special plan.
作者
王进名
刘鹏
孙瑜
王晨伊
杨云飞
WANG Jin-ming;LIU Peng;SUN Yu;WANG Chen-yi;YANG Yun-fei(Offshore Oil Engineering Co.,Ltd.,Tianjin 300461,China)
出处
《化工管理》
2023年第16期163-165,共3页
Chemical Engineering Management