摘要 该文介绍了一种计量装表定向改造拆表拉线夹(四线),其适用于计量装表接电工作中的使用。为了安全、快捷、高效地完成表计带电拆(装)表作业,避免使用金属钳生拉硬拽导致损坏线缆绝缘层,可设计成一把夹子用于固定表计4条线缆,特别是对进表火线进行固定,防止带电火线接触金属表箱导致打火及人员触电事故,确保装拆表施工安全,促进电力工程事业长远发展。 This paper introduces a cable clamp(four-wire)by directionally modified for meter installation,which is suitable for the use in power connection of meter installation.In order to complete the live operation of the installation and removal of the meter safely,fast and efficiently,and avoid using metal clamps to pull hard and cause damage to the cable insulation layer,a clamp can be designed to fix four cables of the meter,especially to fix firing lines that go into the meter,so as to prevent live firing wires from contacting the metal meter box and leading to the accidents of ignition and personal electric shock,ensure the construction safety of meter installation and removal,and promote the long-term development of power engineering.
作者 刘俊 马文文 LIU Jun;MA Wenwen(Shenzhen Power Supply Bureau Co.,Ltd.,Shenzhen,Guangdong Province,518000 China)
出处 《科技资讯》 2023年第10期47-50,共4页 Science & Technology Information
关键词 装表 定向改造 拆表拉线 应用方法 Assemble meters Directional transformation Cable of removing meter Application method
  • 相关文献

参考文献6

二级参考文献39

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部