摘要 海上风电场电气主接线是构成海上风电场电力系统能量枢纽的基本结构,它的可靠运行对电力系统的安全稳定运行有着至关重要的影响。综合考虑状态空间法、最小路集法和状态枚举法的特点,提出了一种基于元件状态空间的全概率枚举可靠性评估方法。通过对某1000 MW海上风电场送出系统主接线进行深入分析,采用该评估方法进行可靠性评估和综合分析,验证了该方法的正确性和有效性,并根据可靠性评估结果提出了相应的改善措施,促进了海上风电场送出系统电气主接线可靠性评价的规范化。 The electrical main wiring of an offshore wind farm is the basic structure that forms the energy hub of the offshore wind farm power system,and its reliable operation has a crucial impact on the safe and stable operation of the power system.Considering the characteristics of state space method,minimum path set method and state enumeration method,a full-probability enumeration reliability evaluation method based on component state space is proposed.Through the in-depth analysis of the main wiring of a 1000 MW offshore wind farm transmission system,the reliability evaluation and comprehensive analysis of the evaluation method are carried out,and the correctness and effectiveness of the method are verified.According to the reliability assessment results,corresponding improvement measures are proposed,which promotes the standardization of the reliability evaluation of electrical main wiring of offshore wind farm transmission system.
作者 张振 陈永延 卢睿 徐晓燕 李炬添 ZHANG Zhen;CHEN Yongyan;LU Rui;XU Xiaoyan;LI Jutian(China Energy Engineering Group Guangdong Electric Power Design Institute Co.,Ltd.,Guangzhou 510663,China;State Key Laboratory of Power Transmission Equipment&System Security and New Technology(Chongqing University),Chongqing 400044,China)
出处 《电工技术》 2023年第9期45-49,共5页 Electric Engineering
关键词 海上风电场 电气主接线可靠性评估 全概率枚举法 状态空间法 最小路集法 offshore wind farms electrical main wiring reliability assessment full probability enumeration method state space method minimum road set method
  • 相关文献

参考文献3

二级参考文献38

  • 1别朝红,王锡凡.抽水蓄能电站主接线的可靠性综合评估[J].电力系统自动化,2006,30(9):9-14. 被引量:19
  • 2陈尚发.大型发电厂电气主接线优化方案的研究[J].电力建设,2006,27(8):23-26. 被引量:15
  • 3杨小华.1000MW超超临界发电机组设计优化[J].电力勘测设计,2006,18(6):44-48. 被引量:7
  • 4沈珊珊,郑英芬.平顶山二电厂向华中电网送电规划研究[J].电网技术,2007,31(8):52-57. 被引量:2
  • 5DL5000-2000火力发电厂设计技术规程[S].北京:中国电力出版社,2000.
  • 6DL/T5153-2002火力发电厂厂用电设计技术规定[S].北京:中国电力出版社,2002.
  • 7KUMAMOTO H,TANAKA K,INOUE K,et al.State-transition Monte Carlo for evaluating large,repairable systems[J].IEEE Transactions on Reliability,1980,R-29(5):376-380.
  • 8BILLINTON R,LI W Y.A system state transition sampling method for composite system reliability evaluation[J].IEEE Transactions on Power Systems,1993,8 (3):761-767.
  • 9UBEDA J R,ALLAN R N.Reliability assessment of composite hydrothermal generation and transmission systems using sequential simulation[J].IEE Proc.-Gener.Transm.Distrib.,1994,141(4):257-262.
  • 10BILLINTON R,JONNAVITHULA A.Application of sequential Monte Carlo simulation to evaluation of distributions of composite system indices[J].IEE Proc.-Gener.Transm.Distrib.,1997,144 (2):87-90.

共引文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部