防撞墙与小箱梁一体预制构件安装关键技术

Key Technologies for Installation of Integrated Precast Components of Anti-collision Walland Small Box Girder
下载PDF
导出
摘要 以上海S3公路主线施工1标为例对防撞墙与小箱梁一体预制构件安装施工技术进行了研究。针对防撞墙与小箱梁一体预制构件与常规预制小箱梁构件的区别,采取了对应的施工技术,并阐述了施工过程中的控制要点,以期为类似工程施工提供一定的参考。 Taking Shanghai S3 Highway Main Line Construction Bid 1 as an example,this paper studies the installation and construction technology of anti-collision wall and small box girder integrated precast components.According to the differences between anti-collision wall and small box girder integral precast component and conventional prefabricated small box girder component,the paper adopts corresponding construction technology,and illustrates the control points in the construction process,so as to provide a certain reference for similar engineering construction.
作者 汪洋 WANG Yang(Shanghai Municipal Construction Co.,Ltd.,Shanghai 200126,China)
出处 《建筑施工》 2023年第5期947-950,共4页 Building Construction
关键词 防撞墙 预制小箱梁 一体安装 关键技术 anti-collision wall precast small box girder integral installation key technology
  • 相关文献

参考文献3

二级参考文献13

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部