期刊文献+

悬臂式预制盖梁无支架反拉法施工 被引量:1

Construction of Cantilever Precast Bent Cap by Reverse-pulling Method Without Support
下载PDF
导出
摘要 结合上海沿江通道越江隧道浦西接线段高架工程实际,从反拉工艺、钢筋选型与布置、荷载转换、吊装过程控制等方面,介绍了反拉法实施盖梁吊装的施工技术。实践证实,所述方法对城市高架的施工具有较好的适用性,可为城市建成区高墩盖梁施工提供参考。 Combined with the elevated project of Puxi connection section of the cross-river tunnel along the Yangtze River in Shanghai,the construction technology of bent cap hoisting by reverse-pulling method is introduced from the aspects of reverse pulling technology,reinforcement selection and layout,load conversion,hoisting process control,etc.The practice has proved that the method has good applicability to the construction of urban viaduct,and can provide reference for the construction of high pier bent cap in urban built-up area.
作者 石茂银 SHI Maoyin(Shanghai Hushen Expressway Construction and Development Co.,Ltd.,Shanghai 200335,China)
出处 《建筑施工》 2023年第5期951-953,共3页 Building Construction
关键词 预制装配 大悬臂盖梁 反拉流程 荷载转换 prefabrication large cantilever bent cap reverse-pulling process load conversion
  • 相关文献

参考文献5

二级参考文献16

共引文献12

同被引文献13

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部