2OR/MO Y, 等. Methodology to determine floating LNG tank capacity by combination of side-by-side down-time simulation and cost/benefit analysis[C]. Offshore Technology Conference,2012.
3《海洋石油工程设计指南》编委会.海洋石油工程FPSO与单点系泊系统设计[s].2007.
4程兵,冯加果,等.大型FLNG/FLPG装置设计和研究基础[R].
5宋吉卫.250000m3FLNG船型总体方案研究报告[R].
6FAGAN C, 等. FLNG design issues-building on known technology[C]//Offshore Technology Conference,2010.
7ICJC Code. International code for the construction and equipment of ships carrying liquefied gases in bulk [S].2013.