摘要
流水施工技术是指将施工内容分解为若干个施工过程,将施工项目划分为若干个施工段,各专业队依次、连续地投入到各施工段进行施工作业,这种流水组织方式能够保证工作队连续、均衡地施工。本文基于现有固定节拍流水施工工期计算原理,结合流水施工基本参数和固定节拍流水施工的特点,通过对现有公式的分析,提出新的固定节拍流水施工工期计算思路,总结出相关公式。结合某流水施工工程实例,对比分析了两种公式的计算应用。结果表明,两种公式计算结果一致。
Flow construction technology refers to decomposing the construction content into several construction processes,dividing the construction project into several construction sections,and each professional team invests in each construction section in turn and continuously to carry out construction work.This flow organization method can ensure the work team work continuously and evenly.Based on the existing fixed-beat running water construction period calculation principle,combined with the basic parameters of the running water construction and the characteristics of the fixed-beat running water construction,this paper proposes a new fixed-beat running water construction period calculation idea and summarizes the relevant formulas through the analysis of the existing formulas.Combined with an example of a flowing water construction project,the calculation application of the two formulas are compared and analyzed.The results show that the calculation results of the two formulas are consistent.
作者
王玉容
李鑫
WANG Yu-rong;LI Xin(School of Architecture and Engineering,Mianyang City University,Mianyang 621000,China)
出处
《价值工程》
2023年第17期97-99,共3页
Value Engineering
关键词
固定节拍流水施工
工期
计算
fixed-rhythm flow construction
construction period
calculation