工业建筑设计中,预埋件及预埋螺栓的种类、数量较多,且安装精度要求较高,施工过程中埋件常见为预埋安装法,尤其是大型侧壁埋件安装后,再次采用木模板进行二次支模,即浪费材料,又增加施工难度、施工周期,本文通过对料仓环壁钢板的预埋安装同时免去剪力墙预埋件一侧二次支模的施工方法进行了施工工艺总结。
In the industrial building design,the type of embedded parts and embedded bolts,quantity is more,and the installation accuracy requirement is higher,common in the construction process of embedded installation,large side wall embedded installation,especially after the secondary wood formwork,the waste of materials,and increase the construction difficulty,the construction cycle,through the ring wall steel silo embedded installation and shear wall embedded side of the secondary formwork construction method of the construction process summary.
作者
张晓栋
Zhang Xiaodong(Gansu First Construction Group Co.,Ltd.,Lanzhou,China)
出处
《科学技术创新》
2023年第15期146-149,共4页
Scientific and Technological Innovation
关键词
预埋件
预埋安装
施工工艺
embedded parts
embedded installation
construction technology