期刊文献+

襄阳至常德铁路荆门西站站型方案研究

Research on Scheme of Xiangyang-Changde railway line Jingmen West Station
下载PDF
导出
摘要 结合沿江高铁武汉至宜昌段可行性研究(鉴修)成果,呼南通道襄荆段、荆荆铁路与沿江高铁在荆门地区采用客运集中作业方案,在城西周家坡站址新建荆门西站。通过技术经济性、运营便捷性、对相关项目不同期开通运营的适应性比选,得出工程投资省、占地少、对运营影响有限的推荐方案。 Combined with the feasibility study results of Wuhan-Yichang section of high-speed railway along the Yangtze River,The Xiang-jing section of Hu-Nantong Road,Jing-jing Railway and high-speed railway along the Yangtze River adopt the centralized passenger transport operation scheme in Jingmen area,Jingmen West Railway Station will be built at Zhoujiapo Station in the west of the city.After the selection of technical economy,the convenience of operation,the adaptability of the relevant projects opened and operated at different times,get the recommended solution with low investment,less occupation of the land and limited impact on operation.
作者 昌梦 CHANG Meng(China Railway SIYUAN Survey and Design Group Co.,Ltd Wuhan 430063)
出处 《铁道勘测与设计》 2023年第3期25-27,共3页 Railway Survey and Design
关键词 荆门西站 影响因素 方案研究 Jingmen West Railway Station Influencing factor Research on Scheme
  • 相关文献

参考文献2

二级参考文献19

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部