期刊文献+

弃土外运临时装船点装船工艺方案

A Technics of Shipmen Scheme of Temporary Loading Point for Waste Soil Outflow
下载PDF
导出
摘要 针对临海、临河城市建设中大量工程弃土无法通过市内填埋消纳而需外运的问题,设计一种弃土外运临时装船点装船工艺方案。该方案通过建设临时装船点的方式将工程弃土进行外运,可为类似工程规划设计及规范编制提供参考。 In view of the problem that a large amount of engineering waste soil cannot be absorbed by landfill in the city and need to be transported out,a technics of shipmen scheme of temporary loading point for transporting waste soil out of the city is designed.The scheme transports the engineering waste soil by constructing temporary loading points,which can provide a reference for the planning and design of similar projects and the preparation of specifications.
作者 王中华 Wang Zhonghua(CCCC Water Transportation Consultants(Shenzhen)Co.,Ltd.)
出处 《港口装卸》 2023年第3期22-24,64,共4页 Port Operation
关键词 城市建设 工程弃土 装船工艺 city development engineering waste soil technics of shipment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部