JC水电站20号、21号导流明渠改建坝段集中在冬季低温时段施工,受外界气候环境影响很大,温控防裂难度大,需要优选大坝混凝土保温方案以确保大坝混凝土防裂安全,保障混凝土的整体施工质量。从工程实际出发,阐述了对混凝土冬期施工快速保温方案进行的研究,所取得的经验可为后续类似工程借鉴。
The#20 and#21 dam sections of JC Hydropower Station,which are reconstructed from diversion open channels,are constructed in the low temperature season in winter.Due to the great impact of the external climate environment,it is difficult to control temperature and prevent cracking.It is necessary to optimize the dam concrete insulation scheme to ensure the crack prevention safety of dam concrete and ensure the overall construction quality of concrete.Based on the engineering practice,this paper introduces the research on the rapid insulation construction scheme in winter,which provides reference for the application in subsequent similar projects.
作者
刘烈志
高卓辉
LIU Liezhi;GAO Zhuohui(Sinohydro Bureau 5 Co.,Ltd.,Chengdu Sichuan 610066)
出处
《四川水力发电》
2023年第3期63-66,共4页
Sichuan Hydropower
关键词
JC水电站
冬期施工
快速保温
聚苯乙烯保温板
聚氨酯
JC Hydropower Station
winter construction
rapid insulation
polystyrene insulation board
polyurethane