期刊文献+

甘再PH1水电站技术供水系统运行方式及技术改造

Analysis of the Operational Modes and Technological Modification for the Technological Water-Supply System at Ganzai PH1 Hydropower Station
下载PDF
导出
摘要 水电站机组技术供水系统设计、运行方式是否合理可行,直接关系到机组安全稳定运行和电站的经济效益。针对甘再PH1水电站机组技术供水系统,分析了技术供水系统运行方式及存在的问题,提出了机组技术供水系统的技术改造方案和设想,为电站机组的安全稳定运行奠定了基础,对同类型机组技术供水系统的设计、运行管理具有一定的参考价值。 The operational safety and stability of generator units as well as the economics of the hydropower plant directly hinge on how reasonable and viable the technological water-supply system design and operational mode are for the hydropower plant.The operational mode and problems of the technological water-supply system in Ganzai PH1 Hydropower Station is analyzed.Meanwhile,in order to improve the safety and reliability of the generator units and its associated equipment,a renovation and modification plan regarding the water-supply system is proposed in the article,which could provide reference for the design and management of similar water-supply system.
作者 李永强 刘均明 LI Yongqiang;LIU Junming(Sichuan Energy Power Development Group Co.,Ltd.,Chengdu Sichuan 610000;Sichuan Energy Investment Energy Saving and Environmental Protection Investment Co.,Ltd.,Chengdu Sichuan 610000)
出处 《四川水力发电》 2023年第3期133-136,共4页 Sichuan Hydropower
关键词 水电站 技术供水 运行方式 技术改造 hydropower station technological water-supply operational mode technological renovation and modification
  • 相关文献

参考文献4

二级参考文献1

  • 1陈存祖,吕鸿年合编.水力机组辅助设备.中国水利水电出版社,2004,8.

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部