摘要
五化灌区是南宁市唯一的大型灌区,建于20世纪六七十年代。按照“水利工程补短板,水利行业强监管”水利改革总基调要求,实施五化灌区续建配套与现代化改造意义重大。施工组织是项目实施的重要保障,本文主要从施工条件、施工导流、料场选择、施工布置及进度控制等5个方面论述五化灌区续建配套与现代化改造施工组织设计。
As the only large-scale irrigation zone in Nanning City,Wuhua Irrigation Zone was built in the 1960s and 1970s.In accordance with the overall keynote requirements of the water conservancy reform of improving the weak parts in water conservancy engineering and strengthening supervision in the water conservancy industry,the contin⁃ued construction of supporting facilities and modernization upgrade in Wuhua irrigation areas is of great signifi⁃cance.Construction organization is an important guarantee for project implementation.The construction organiza⁃tion design of this project was presented in respects of construction conditions,construction diversion,selection of material yards,construction arrangement and progress control.
作者
张艳艳
ZHANG Yan-yan(Guangxi Guiyu Engineering Consultant Co.,Ltd.,Nanning 530023,China)
出处
《广西水利水电》
2023年第3期61-63,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
五化灌区
续建配套
施工组织
Wuhua Irrigation Zone
continued construction of supporting facilities
construction organization