摘要
自各大火电厂加装脱销设备后空预器堵塞成了行业内重大难题,为了论证如何能彻底解决空预器堵塞问题,以某电厂空预器近年来进行的一系列清灰防堵方法进行比较分析后,发现目前只有热二次风再循环技术能将某电厂300 MW锅炉空预器烟气侧阻力始终保持在1.2 k Pa左右,对北方大部分区域的大型火电厂空预器防堵有借鉴作用。
Since the major thermal power plants to install de-soldering equipment air preheater clogging has become a major problem in the industry,in order to demonstrate how to completely solve the problem of air preheater clogging,a power plant air preheater in recent years to carry out a series of comparative analysis of ash cleaning and anti-clogging methods,found that only the current hot secondary air recirculation technology can be a power plant 300 MW boiler air preheater flue gas side resistance is always maintained at about 1.2 kPa,for This is a useful reference for large thermal power plants in most northern regions to prevent blocking of the air preheater.
作者
张岩
Zhang Yan(Shanxi Xingneng Power Generation Co.,Ltd.,Gujiao Shanxi 030206)
出处
《机械管理开发》
2023年第6期132-133,136,共3页
Mechanical Management and Development
关键词
燃煤锅炉
脱硝
硫酸氢铵
传热元件
再循环
coal-fired boiler
denitrification
ammonium bisulfate
heat transfer element
recirculation