Early construction cost and time risk assessment and evaluation of large-scale underground cavern construction projects in Singapore

原文传递
导出
摘要 The applicability of the Decision Aids for Tunneling(DAT)as an early construction cost and time predicting tool for large-scale underground cavern construction projects is investigated in this study.For this purpose,three large-scale underground cavern construction projects in Singapore are presented using the proposed framework.The data from Project A,which is already completed,are used to validate the prediction outcomes.The results show that the proposed workflow can well estimate the construction cost and time at the 95%confidence level.The DAT simulation results of the other two projects,which are in the early planning stages,are compared with Project A to assess the accuracy of the predicted cost and time.The results show that the proposed workflow with the DAT as a predictor is a valuable tool in estimating construction cost and time for large-scale underground cavern projects,particularly for feasibility studies.
出处 《Underground Space》 SCIE EI 2020年第1期53-70,共18页 地下空间(英文)
基金 The authors would like to acknowledge Professor Herbert H.Einstein(MIT)for his valuable comments and revisions.Additionally,the authors would like to thank the Jurong Town Corporation(JTC)for the funding provided to this project and for generously allowing us to use data from the construction of the rock cavern,without which this work would not have been possible.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部