不同建筑面积下冷热双蓄空调系统的运行费用

Operating Cost of Thermal Storage Air-Conditioning System under Different Construction Areas
下载PDF
导出
摘要 本文以江苏省南京市建筑面积为2×10^(4)m^(2)和1×10^(5)m^(2)的写字楼办公建筑为研究对象,研究地源热泵+冷水机组+水冷热双蓄和冷水机组冰蓄冷+电锅炉水蓄热两种技术路线配置方案的运行成本。结果表明,蓄能空调系统的运行成本与主机容量、效率和水泵等其他辅助设备容量密切相关;地源热泵+冷水机组+水冷热双蓄配置方案的运行成本低于相同情况下电锅炉水蓄热+冷水机组冰蓄冷。 Taking the office buildings with a construction areas of 2×10^(4)m^(2)and 1×10^(5)m^(2)in Nanjing,Jiangsu Province as the research object,this paper studies the operating cost of the two technical route configuration schemes of ground-source heat pump+water chiller+water cool and heat storage and water chiller ice cool storage+electric boiler water heat storage.The results show that the operating cost of the thermal storage air-conditioning system is bound up with the capacity and efficiency of air conditioning host,the water pump and other auxiliary equipment capacity of the main engine etc.The operating cost of the technical route configuration scheme of ground-source heat pump+water chiller+water cool is lower than that of electric boiler water heat storage+water chiller ice cool storage under the same circumstances.
作者 顾昊 汪俊超 GU Hao;WANG Junchao(Nari Electric Power Design CO.,Ltd.,Nanjing,Jiangsu 211106,China)
出处 《自动化应用》 2023年第10期206-207,222,共3页 Automation Application
关键词 蓄能空调 地源热泵 冷水机组 电锅炉 运行成本 thermal storage air-conditioning system ground-source heat pump water chiller electric boiler operating cost
  • 相关文献

参考文献3

二级参考文献13

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部