期刊文献+

马兰矿10604工作面水力压裂切顶卸压技术的应用研究 被引量:4

Research on the Application of Hydraulic Fracturing,Roof Cutting and Pressure Relief Technology in Working Face 10604 of Malan Mine
下载PDF
导出
摘要 为了解决马兰矿10604工作面受相邻工作面采掘扰动影响下巷道围岩变形严重的问题,采用水力压裂技术在超前工作面进行定向水力压裂切顶卸压来降低巷道附近的高集中应力,以此达到使巷道处于低压区的目标。结合10604工作面地质条件,对水力压裂钻孔相关施工参数进行确定并进行工业性试验,实践效果良好,压裂后巷道围岩变形量大幅降低,巷道围岩变形处于可控范围,能实现巷道的重复利用。 In order to solve the problem of serious deformation of roadway surrounding rock in the 10604 working face of Malan Coal Mine under the influence of mining disturbance from adjacent working faces,hydraulic fracturing technology is used to conduct directional hydraulic fracturing and roof cutting at the advanced working face to reduce the high concentrated stress near the roadway,thereby achieving the goal of keeping the roadway in a low-pressure zone.Based on the geological conditions of working face 10604,relevant construction parameters for hydraulic fracturing drilling were determined and industrial tests were conducted.The practical results were good.After fracturing,the deformation of roadway surrounding rock was significantly reduced,and the deformation of roadway surrounding rock was within a controllable range,enabling the reuse of the roadway.
作者 李卓 Li Zhuo(Shanxi Coking Coal Xishan Coal Electricity Group Malan Mine,Taiyuan Shanxi 030053)
出处 《山西冶金》 CAS 2023年第4期53-54,60,共3页 Shanxi Metallurgy
关键词 综采工作面 水力压裂 切顶卸压 围岩变形 fully mechanized mining face hydraulic fracturing top cutting pressure relief surrounding rock deformation
  • 相关文献

参考文献2

二级参考文献23

共引文献45

同被引文献12

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部