采煤工作面过构造发育区顶板冒落治理技术研究

Study on Roof Caving Control Technology in Coal Mining Face Through Structural Development Zone
下载PDF
导出
摘要 依据某矿11203采煤工作面现场情况,提出综合使用注浆(充填)、锚索补强等方式对构造影响区不稳定煤体及顶板进行加固,依据现场条件给出治理技术方案并进行工程应用。现场应用后,某矿11203采煤工作面在地质构造影响区内生产时未出现片帮、冒顶或者支架不稳等情况,采面保持4.8 m/d回采速度,现场取得较好效果。 Based on the on-site situation of 11203 coal mining face in a certain mine,it is proposed to comprehensively use grouting(filling),anchor cable reinforcement,and other methods to strengthen the unstable coal body and roof in the structural impact area.According to the on-site conditions,a treatment technical plan is proposed and applied in engineering.After field application,there was no slope spalling,roof fall or unstable support in 11203 working face of a mine during production in the tectonics affected area.The mining speed of 4.8 m/d was maintained at the mining face,and good results were achieved on the site.
作者 孟小强 Meng Xiaoqiang(Fenxi Mining Industry Group Liuwan Coal Mine,Xiaoyi Shanxi 032300)
出处 《山西冶金》 CAS 2023年第4期187-188,215,共3页 Shanxi Metallurgy
关键词 煤岩开采 地质构造 顶板冒落 超前注浆 顶板控制 coal and rock mining tectonics roof caving advance grouting roof control
  • 相关文献

参考文献10

二级参考文献58

共引文献276

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部