摘要
阐述风电场中的2.0MW机组变桨系统的改造设计、实验室测试、风场运行效果的分析,实践表明,原机组经过针对性的变桨系统改造,设计方案具有可行性,改造后变桨系统运行稳定、故障率下降明显,具备推广性。
This paper expounds the transformation design,laboratory testing,and analysis of the wind farm operation effect of the pitch system of a 2.0MW unit in a wind farm.Practice has shown that the original unit has undergone targeted pitch system transformation,and the design scheme is feasible.After the transformation,the pitch system operates stably,with a significant decrease in fault rate,and has the potential for promotion.
作者
吴松
贾帅
何晓峰
李锋
李中明
WU Song;JIA Shuai;HE Xiaofeng;LI Feng;LI Zhongming(Northwest Branch of State Power Investment Group Xiong'an Energy Co.,Ltd.,Gansu 730050,China;Beijing Jinfeng Huineng Technology Co.,Ltd.,Beijing 100176,China)
出处
《电子技术(上海)》
2023年第4期139-141,共3页
Electronic Technology