摘要
针对大采高综采工作面回采过程中顶板压力大、顶板控制难、出现底鼓难等一系列现场管理难题。以补连塔煤矿大采高综采工作面为例,介绍了7 m大采高综采工作面回采过程中支架工作阻力确定方法、顶板管控办法、末采贯通顶板控制。为类似地质条件的大采高综采工作面顶板管理提供一定的借鉴。
Aimed at a series of field management problems such as high roof pressure,difficult roof control and floor heave in the process of fully mechanized face with large mining height.Taking Bulianta Coal Mine as an example,this paper introduces the determination method of working resistance of support,roof control method and roof control in the process of fully mechanized face with 7 m mining height.It provides a certain reference for the roof management of fully mechanized face with large mining height under similar geological conditions.
作者
卞涛
李金刚
呼天峰
BIAN Tao;LI Jin gang;HU Tianfeng(Bulianta Coal Mine,CHN Energy Shendong Coal Group Co.,Ltd.,Erdos 017209,China)
出处
《中国矿业》
2023年第S01期350-354,共5页
China Mining Magazine
关键词
顶板压力
工作面阻力
顶板管控
末采贯通
底鼓
roof pressure
face resistance
roof control
the end of mining through
bottom drum