合肥市畅通二环·北环快速路改造工程总体设计方案 被引量:1

Overall Design Scheme of Hefei Changtong Ring II·North Ring Expressway Reconstruction Project
下载PDF
导出
摘要 针对合肥市畅通二环·北环快速路改造工程总体设计方案进行分析研究。分析了建设条件,对规划进行了解读,得出项目的功能定位和研究的重难点。通过交通流量预测,确定了道路横断面和项目的建设规模。重点对总体布置方案中环线快速路如何有效屏蔽穿城交通进行了研究,统筹考虑立交节点和匝道的布设。最后总结了环线快速路的设计重难点,并就道路断面中复杂的主辅切换系统提出处理措施。 The overall design scheme of Hefei Changtong Ring II·North Ring Expressway Reconstruction Project is analyzed and studied.The construction conditions of the project are analyzed,its planning is interpreted,and the functional orientation,the study essentials and the difficulties are obtained.The road cross section and construction scale of the project are determined through the traffic flow prediction.The overall layout scheme focusing on how to effectively shield the cross-city traffic on the ring expressway is studied.The layout of interchange nodes and ramps is comprehensively considered.Finally,the key and difficult points in the design of the ring expressway are summarized,and the treatment measures for the complex switching system of the main and auxiliary roads in the road section are proposed.
作者 张伟 ZHANG Wei
出处 《城市道桥与防洪》 2023年第6期12-15,M0004,M0005,共6页 Urban Roads Bridges & Flood Control
关键词 城市环路 快速路 总体设计 立交节点 主辅切换 overall design expressway overall design interchange node switching of main auxiliary roads
  • 相关文献

参考文献3

二级参考文献5

共引文献3

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部