唐安煤矿35 kV变电站增容改造设计 被引量:1

Design of capacity expansion and transformation of 35 kV substation in Tang'an Coal Mine
下载PDF
导出
摘要 为了满足唐安煤矿生产用电的需求,需要对唐安煤矿35 kV变电站增容改造。本文介绍了变电站改造设计的内容,重点分析了变电站改造的实现过程。在建改造后,变电站的容量由8000 k VA提升到20000 kVA,并实现了综合自动化管理,可以满足煤矿安全用电的需要。 In order to meet the demand of production electricity in Tang'an Coal Mine,it is necessary to increase the capacity of 35 kV substation in Tang'an Coal Mine.This paper introduces the content of substation transformation design,and analyzes the realization process of substation transformation.After the transformation under construction,the capacity of the substation is increased from 8000 kVA to 20000 kVA,and the integrated automation management is realized,which can meet the needs of coal mine safety.
作者 崔峰 Cui Feng(Tang'an Coal Mine Branch,Shanxi Lanhua Technology Venture Co.,Ltd.,Jincheng 048000,China)
出处 《煤炭与化工》 CAS 2023年第5期78-81,共4页 Coal and Chemical Industry
关键词 变电站 扩容改造 自动化管理 substation expansion transformation automation management
  • 相关文献

参考文献7

二级参考文献11

共引文献4

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部