摘要
为探索超低能耗装配式建筑外墙保温施工,以几个超低能耗装配式项目为参考,通过对节点位置进行研究,结合现场实际施工情况,从材料准备阶段、模板搭设阶段、墙体成形阶段几方面进行分析,解决超低能耗装配式建筑外墙保温在当前阶段施工的问题,总结的经验可对后续的施工起到指导作用。
To explore the external wall insulation construction of ultra low energy consumption prefabricated building.several ultra low energy consumption prefabricated projects are taken as references,and the node positions are studied.Based on the actual construction situation on site,it is analyzed from several aspects:material preparation stage,formwork erection stage,and wall forming stage.It solves the problem of external wall thermal insulation of ultra low energy consumption prefabricated building in the current stage of construction.The summarized experience can provide guidance for subsequent construction.
作者
王欣平
侯义芬
邵志兵
叶文启
WANG Xinpingg;HOU Yifen;SHAO Zhibingg;YE Wenqi(Zhongtian Construction Group Co.,Ltd.,Shanghai 201102,China)
出处
《建筑施工》
2023年第6期1107-1110,共4页
Building Construction
关键词
超低能耗
装配式
外墙保温
施工优化
ultra low energy consumption
prefabricated type
external wall insulation
construction optimization