8LEE T E, SONG J S. Searched-based heuristic algorithms for basic planning in a large shipyard[J].Journal of Ship Production, 1996, 12(4):211-219.
9NEUMANN R J. Network scheduling development in an MRP II environment [J ]. Journal of Ship Production, 1994, 10(4):223-232.
10PARK K, LEE K, PARK S, etal. Modeling and solving the spatial block scheduling problem in a shipbuilding company [J]. Computers & Industrial Engineering, 1996, 30(3) :357-364.