根据消防水池设计要求,其中,消防水池独立使用应能满足一个消防水池检修,另外一个消防水池仍能正常供水。两座消防水池不能共用分隔墙。对于两堵剪力墙结构,此时当一侧剪力墙混凝土浇筑完成后,另一侧的剪力墙外模板的施工是个难点。特别是对于两侧剪力墙长度均较大时,给模板的支设和拆除带来一定的难度。现根据实际施工过程中遇到的一些施工做法,来探讨和研究一种新的施工做法,以解决类似工程模板施工的问题。
According to the design requirements of the fire pool,the independent use of the fire pool should be able to meet the maintenance requirements of one fire pool,while the other fire pool can still supply water normally.Two fire water tanks cannot share a partition wall.For two shear wall structures,the construction of the outer formwork of the other side of the shear wall is a challenge after the concrete pouring of one side of the shear wall is completed.Especially when the length of the shear walls on both sides is relatively large,it brings certain difficulties to the support and removal of the formwork.Based on some construction practices encountered during the actual construction process,we will explore and study a new construction method to solve problems similar to engineering template construction.
作者
朱金永
ZHU Jin-yong(Guangdong Yuantian Engineering Co.,Ltd.,Guangzhou 511340,China)
出处
《价值工程》
2023年第18期149-151,共3页
Value Engineering
关键词
消防水池
混凝土隔墙
模板施工方法
fire pool
concrete partition wall
formwork construction method